Transmission & Distribution Line Projects
Imperial Oil-Kearl Oil Sand - Initial Development (KID) & Expansion Project (KEP)
Client: Fluor Canada
230kV, 72kV, 13.8kV and 4.16kV Transmission/Distribution Line detailed design using wood and steel pole structure. Project consists of six main transmission lines feeding electrical need for various areas of the oil sand project.
Length: 120 km
Year: 2008 - 2014
- Back
- 4 of 4